This is a commercial office building addition with a steel structure.
_format(webp)%20(7).avif)
The main concern for this project was the speed of installation and preparing the façades as quickly as possible. This approach allows the interior trades to accelerate their work accordingly.
‍
_format(webp)%20(8).avif)
_format(webp)%20(9).avif)
STELTON
SZ, SF
8,000 SF
PRODUCT
DWall 1500
CLADDING MATERIAL
Aluminum
,Â
Brick Slip
,Â
PROJECT TYPE
Renovation
,Â
Retail Building
,Â
LOCATION
Piscataway, NJ
_format(webp)%20(11).avif)
INTERESTING FACTS ABOUT THE PROJECT
This is a non residential project.
_format(webp)%20(1).avif)
_format(webp)%20(2).avif)
_format(webp)%20(3).avif)
_format(webp)%20(4).avif)
_format(webp)%20(5).avif)
_format(webp)%20(6).avif)






_format(webp)%20(6).avif)
_format(webp)%20(1).avif)
_format(webp)%20(2).avif)
_format(webp).avif)
_format(webp).avif)
_format(webp).avif)
_format(webp)%20(3).avif)